Project Schedule for TriBike and Running Cart.

22OCT09 – Concept sketches

29Oct09 – Refined sketches

4Nov09 – Aesthetic /design sketches

18Nov09 – First CAD design review

25Nov09 – Second CAD design review

30Nov09 – Third CAD design review

16Dec09 – Final CAD design review with Finite Element Analysis of the handcycle frame.

1Jan10 – Start Fabrication of frames.

15Mar10 – Frame assembly – Test Riding!!

1Apr10 – Delivery


Leave a Reply

You must be logged in to post a comment.

preload preload preload